Compact concrete sleeper plant for a railway project in Zambia
VDA sourced a compact prestressed concrete sleeper plant from a Turkish manufacturer for a South Africa based buyer. The plant has been manufactured in Türkiye and shipped to Zambia for a railway project. It is designed to produce 40 sleepers per day.
| Product | Compact concrete sleeper plant |
|---|---|
| Project country | Zambia |
| Buyer | South Africa based company |
| Design output | 40 sleepers per day |
| Moulds | 10 four-gang moulds |
| Mould handling | Overhead crane |
| VDA role | Sourcing from a Turkish manufacturer |
Scope supplied
- 10 four-gang sleeper moulds with tie rods and bolts
- Tensioning machine with steel frame, hydraulic unit and electric panel
- 2 de-tensioning machines with their station
- Button heading machine with hydraulic unit
- Vibration table
- Demoulding table and mould turning frame for the crane
- Assembly, commissioning and operator training during test production

How the plant works
Moulds move between stations by overhead crane: reinforcement preparation, tensioning, casting on the vibration table, curing, de-tensioning, turning and demoulding. Each mould holds four sleepers, so ten moulds give 40 sleepers per production cycle. See the compact concrete sleeper plant