
Crane System Manhole Base Machine
Crane system machine for manhole bases Ø800 to Ø1500 mm and 2000×2000 mm, with inlet and outlet openings from Ø150 to Ø1200 mm.
- Machine system
- Crane system
- Bases
- Ø800 to Ø1500 mm, 2000×2000 mm
- Openings
- Ø150 to Ø1200 mm
- Option
- 2000×1000 mm reduction slab
- Standard
- EN 1917
- Built in
- Türkiye
A crane system machine for the base section of a manhole, the element that carries the pipe connections. Inlet and outlet openings from Ø150 to Ø1200 mm are formed during casting, so bases arrive on site ready to connect. A 2000×1000 mm reduction slab is available as an option.
- Vibration table in St52 steel, 25 mm plate
- Movable belt-feeder bunker, 2.5 m³
- Moulds moved by overhead crane, manual control
Elements are produced to EN 1917. Pair it with the elevator system ring and cone machine for a complete manhole set.
Output by size
Typical values from manufacturer documentation, per 8 hour shift. Final figures are confirmed in the manufacturer's offer for your project.
Manhole bases, output per 8 hour shift
| Base | Height | Wall thickness | Units per 8 h |
|---|---|---|---|
| Ø800 mm | 600 mm | 100 mm | 30 |
| Ø1000 mm | 780 / 1,000 mm | 150 mm | 25 |
| Ø1200 mm | 780 / 1,000 mm | 150 mm | 25 |
| Ø1500 mm | 1,000 mm | 200 mm | 10 |
| 2000×2000 mm | 1,000 mm | 250 mm | 5 |
Specifications
Typical values from manufacturer documentation. Final figures are confirmed in the manufacturer's offer for your project.
| Control | Manual |
|---|---|
| Vibration table | St52 steel, 25 mm |
| Concrete feed | Movable belt-feeder bunker, 2.5 m³ |
| Mould handling | Overhead crane |
| Standard | EN 1917 |
From manufacturer documentation. Final figures are confirmed in the offer for your project.
Questions buyers ask
Why a separate machine for manhole bases?
Bases carry the pipe connections and are heavier than rings. The crane system handles the larger moulds and forms the inlet and outlet openings during casting.
What is included in installation and training?
The manufacturer installs and commissions the machine on site and trains your operators. Your team prepares the foundation, power supply and lifting equipment. Trial production is checked on a test press for crack load and watertightness.
What are typical delivery and payment terms?
Delivery is usually 30 to 45 days from the down payment and approved drawings. Payment is commonly 50% in advance and 50% before shipment by T/T or L/C, on EXW, FOB or CIF terms. Final terms are set in the contract.
What warranty and spare parts support is offered?
The manufacturer gives a one year warranty and keeps spare parts available for 10 years. Wear parts such as pallets and gaskets are supplied on demand, and VDA can supply them as a running order.
Related machinery

Elevator System Manhole Ring & Cone Machine
Elevator system machine for manhole rings Ø800 to Ø1500 mm and cones up to Ø1500/620 mm, for sewer, stormwater, telecom and hydrant…
View details
Crane System Pipe & Box Culvert Machine Ø800–3000 mm
Crane system machine for reinforced concrete pipes Ø800 to Ø3000 mm and box culverts up to 3000×3000 mm. One machine, only the…
View details
Steel Pallets & Integrated Gaskets for Concrete Pipe Machines
Steel bottom and top pallets and integrated rubber gaskets for vertical concrete pipe machines, Ø150 to Ø3000 mm. For new machines or…
View detailsGet offers for Crane System Manhole Base Machine
- Tell us the product, capacity and project country.
- We clarify the technical scope with you.
- You receive offers from suitable manufacturers to compare.
- Prefer WhatsApp? +90 543 797 58 57