Request a quote
Machinery & Plant Sourcing · Concrete Sleeper Plants

Turnout sleeper production plant

A long-line plant for prestressed concrete turnout bearers. Every bearer in a turnout set has its own length and fastening positions, so the line casts long beams on prestressing beds and saw cuts them to the lengths of the set.

Product
Prestressed concrete turnout bearers
Production method
Long-line beds with saw cutting
Set layout
Length and dowel positions per bearer
Design standard
EN 13230-4 or as specified
Capacity
Defined per project, expandable

Indicative figures based on manufacturer data. Capacity and specification are confirmed in each offer.

Matched to your specification. Offers from suitable Turkish manufacturers, compared side by side.
Meet the maker. Video call or factory visit in Türkiye before you decide.
Secure payment. Advance payment or letter of credit, set out in the contract.

What turnout sleepers are

Turnout sleepers, also called turnout bearers, carry the rails at switches and crossings, where a train moves from one track to another. They are produced as sets. Within a set, the length, the number of dowels and the dowel positions change from bearer to bearer. Prestressed concrete bearers are used on new lines and are replacing timber bearers on existing ones.

How a turnout sleeper line works

Bearers are cast on long steel prestressing beds. Dowels are positioned on the bed to the drawing of each bearer, reinforcement and stirrups are placed, and the wires are tensioned from a hydraulic tensioning station. A travelling casting machine fills and compacts the bed along its length. After curing, the force is released, the beams are demoulded and turned, and an automatic saw cuts them to the lengths of the set.

Why buyers choose this line

  • Built for sets. Dowel and cut positions are set for each bearer, so a complete turnout set can be produced on the same bed.
  • Automated stages. Tensioning, release, casting, vibration, turning, curing control and cutting are machine-driven, which keeps dimensions consistent.
  • Scalable. Capacity is defined per project and can be increased by adding beds.
  • Support beyond delivery. Layout, installation, operator training and spare parts can be included in the scope.
Turnout Sleeper Production Plant
Production process

How the line works

Step 01

Reinforcement preparation

Prestressing wires are cut to length and prepared with their anchorages.

Step 02

Bed preparation

The bed is cleaned and oiled, and dowels are fixed to the positions of each bearer in the set.

Step 03

Reinforcement placement

Wires and stirrups are placed along the bed and fixed in position.

Step 04

Tensioning

The hydraulic tensioning station tensions the wires to the design force.

Step 05

Casting and curing

A travelling casting machine fills and vibrates the bed. The concrete then cures under controlled conditions.

Step 06

Release, turning and cutting

The force is released, the beams are demoulded and turned, and an automatic saw cuts each bearer to length. Bearers are stacked as sets.

Key components

Main machines and systems

Long-line prestressing beds

Steel beds on which the bearers are cast in a continuous line.

Bed length
Per manufacturer's offer
Number of beds
Per manufacturer's offer

Tensioning and release station

Hydraulic cylinders with a control panel tension the wires before casting and release them after curing.

Tensioning force
Per manufacturer's offer

Travelling casting machine

Runs along the bed with its own hopper, distributes the concrete and compacts it with vibration.

Turning system

Turns the demoulded beams so they can be inspected and moved to the saw.

Automatic sleeper cutting machine

PLC-controlled saw with touch panel that cuts the cast beams into bearers of the required lengths.

Lifting and stacking equipment

Lifting beams and crane equipment for stacking bearers as complete sets.

Technical data

Specifications

Typical values from manufacturer documentation. Final figures are confirmed in the manufacturer's offer for your project.

ProductPrestressed concrete turnout bearers
Bearer length rangePer manufacturer's offer
Bearer cross-sectionPer manufacturer's offer
Bed lengthPer manufacturer's offer
Number of bedsDefined per project
Tensioning forcePer manufacturer's offer
CuttingAutomatic saw, PLC control
Design standardEN 13230-4 or as specified

Bed layout, bearer sizes and capacity are defined for each project from the turnout drawings.

Who it's for

Built for these buyers

Turnout and track component producers

Companies adding concrete turnout bearers to their range.

Existing sleeper plants

Mainline sleeper producers extending into switches and crossings.

Rail infrastructure contractors

Contractors who need turnout sets produced for a network programme.

Railway administrations

Owners replacing timber turnout bearers with prestressed concrete.

Request a quote

Get offers for Turnout Sleeper Production Plant

  • Tell us the product, capacity and project country.
  • We clarify the technical scope with you.
  • You receive offers from suitable manufacturers to compare.
  • Prefer WhatsApp? +90 543 797 58 57