Mobile Concrete Batching Plant, 70 m³/h
70 m³/h · 1.3 m³ pan mixer · 45 m³ aggregate bunker
- Capacity
- 70 m³/h
- Mixer
- Pan mixer, 1.3 m³
- Aggregate bunker
- 3 x 15 m³ (45 m³)

A mobile batching plant with a 2 m³ twin-shaft mixer and a four-compartment in-line bunker. One truck tractor moves the chassis. Two 100 t cement silos are included.
Figures from manufacturer documentation. Availability and specification are confirmed in our offer.
Values from the manufacturer's technical offer. Final scope is confirmed in our offer.
Availability is confirmed at the time of your request. Listed machines may be sold without prior notice.
| Type | Mobile, single-axle chassis with 4 tyres, towed by one truck tractor |
|---|---|
| Rated capacity | 100 m³/h |
| Control cabin | Mounted on the plant |
| Condition | New |
| Aggregate bunker | In-line, 4 compartments x 18 m³ (72 m³ total), St 37 steel 5 mm |
|---|---|
| Bunker dimensions | 2,600 x 16,000 x 4,250 mm |
| Bunker vibrators | 2 x 0.38 kW |
| Bunker gates | 80 x 300 mm pneumatic cylinders |
| Aggregate weighing | 2.3 m³, load cells 4 x 5,000 kg, 0.37 kW vibrator |
| Weighing belt | 1,000 x 9,500 mm, 11 kW drive |
| Transfer belt | 1,000 x 14,000 mm, chevron belt, 11 kW drive |
| Type | Twin-shaft mixer |
|---|---|
| Wet concrete volume per batch | 2 m³ |
| Drive | 2 x 37 kW geared motors |
| Shell and liners | St 37 10 mm shell; ST52 12 mm wear-resistant liners |
| Mixing paddles | Chrome alloy cast steel |
| Lubrication | Automatic, while the mixer runs |
| Discharge | 100 x 250 mm pneumatic cylinder with open/closed sensors |
| Access | Ladder, platform and railings |
| Cement scale | 1,200 kg, load cells 3 x 2,000 kg |
|---|---|
| Water scale | 850 kg, load cells 3 x 2,000 kg |
| Admixture scale | 30 l, load cell 1 x 150 kg |
| Cement silos | 2 x 100 t with equipment |
|---|---|
| Cement screw conveyors | 2 x Ø219 x 8,000 mm, 11 kW |
| Water pump | 5.5 kW, 60 t/h |
| Air compressor | 500 l, 5.5 kW, 10 bar |
| Control | Fully automatic PLC; manual override possible at every stage |
|---|---|
| Recipes | Create, save, edit and delete recipes on screen |
| Records and reports | Customer details stored; production report for each delivery |
| Protection | All motors protected against voltage fluctuations; warning on weighing values outside calibration limits |
| Installation | By the manufacturer's team, including test production and operator training |
|---|---|
| Provided by the buyer | Civil foundations to the manufacturer's drawings, electrical supply to the plant, water line to the plant |
| Provided by the buyer for installation | Mobile crane, welding machine and helpers |
| Installation team | Visa, travel and accommodation paid by the buyer |
70 m³/h · 1.3 m³ pan mixer · 45 m³ aggregate bunker
140 m³/h · 4 m³ twin-shaft mixer · 120 m³ aggregate bunker
3,840 blocks or 11,520 pavers per 8-hour shift
We use cookies
We use analytics and advertising cookies (Google and Meta) to understand how visitors use this site and to measure our ads. You can accept or reject them; the site works either way. Privacy Policy