Mobile Concrete Batching Plant, 100 m³/h
100 m³/h · 2 m³ twin-shaft mixer · 72 m³ aggregate bunker
- Capacity
- 100 m³/h
- Mixer
- Twin-shaft, 2 m³
- Aggregate bunker
- 4 x 18 m³ (72 m³)

A mobile batching plant on a single-axle chassis, for contractors who move between project sites. Pan mixer, three-compartment aggregate bunker, one 100 t cement silo and fully automatic PLC control.
Figures from manufacturer documentation. Availability and specification are confirmed in our offer.
Values from the manufacturer's technical offer. Final scope is confirmed in our offer.
Availability is confirmed at the time of your request. Listed machines may be sold without prior notice.
| Type | Mobile, single-axle chassis with 4 tyres |
|---|---|
| Rated capacity | 70 m³/h |
| Control cabin | Mounted on the plant |
| Condition | New |
| Aggregate bunker | 3 compartments x 15 m³ (45 m³ total), St 37 steel 5 mm |
|---|---|
| Bunker vibrator | 1 x 0.38 kW |
| Bunker gates | 80 x 300 mm pneumatic cylinders for precise dosing |
| Aggregate weighing belt | 1.5 m³ weighing capacity, 7.5 kW drive |
| Transfer belt | 800 x 10,000 mm, chevron belt, 11 kW drive |
| Type | Pan mixer |
|---|---|
| Wet concrete volume per batch | 1.3 m³ |
| Drive | 45 kW motor, 1450 rpm, 4-stage gearbox |
| Shell and liners | St 37 10 mm shell; ST52 10 mm wear-resistant liners |
| Mixing paddles | High-manganese chrome alloy cast steel |
| Cement scale | 850 kg, load cells 3 x 2,000 kg |
|---|---|
| Water scale | 600 kg, load cells 3 x 1,000 kg |
| Admixture scale | 15 l, load cell 1 x 150 kg |
| Cement silo | 1 x 100 t with electronic filter and level indicators |
|---|---|
| Cement screw conveyor | 1 x Ø219 x 8,000 mm, 9 kW |
| Water pump | 4 kW, 45 t/h |
| Air compressor | 300 l, 4 kW, 8 bar |
| Control | Fully automatic PLC; manual override possible at every stage |
|---|---|
| Recipes | Create, save, edit and delete recipes on screen |
| Records and reports | Customer details stored; production report for each delivery |
| Protection | All motors protected against voltage fluctuations; warning on weighing values outside calibration limits |
| Installation | By the manufacturer's team, including test production and operator training |
|---|---|
| Provided by the buyer | Civil foundations to the manufacturer's drawings, electrical supply to the plant, water line to the plant |
| Provided by the buyer for installation | Mobile crane, welding machine and helpers |
| Installation team | Visa, travel and accommodation paid by the buyer |
100 m³/h · 2 m³ twin-shaft mixer · 72 m³ aggregate bunker
140 m³/h · 4 m³ twin-shaft mixer · 120 m³ aggregate bunker
3,840 blocks or 11,520 pavers per 8-hour shift
We use cookies
We use analytics and advertising cookies (Google and Meta) to understand how visitors use this site and to measure our ads. You can accept or reject them; the site works either way. Privacy Policy